The Bilajari locomotive depot is a shining example of Azerbaijan Railways' modern development. Built with the latest technologies, the depot stands out for its technical capabilities and ecological approach.
Modern conditions for locomotive inspection and repair have been created, with equipment from world-leading companies installed.
One of the key highlights is the use of alternative energy. Solar panels installed on the roof generate energy used for the depot's operations.
This contributes to energy savings and environmental sustainability. The Bilajari depot was built under the project "Construction of two depots for 50 AC locomotives - Bilajari and Ganja."
The project is a significant step towards modernizing Azerbaijan's railway infrastructure and transitioning to the 4th industrial revolution. Highly qualified specialists trained abroad work here.
The depot, equipped with modern technologies, plays a crucial role in strengthening Azerbaijan's transport and logistics potential.












